HVAC maintenance agreement price calculator
Price the visits the agreement actually promises.
Example
Biggest lever: Visits per year. +10% raises the result to $309.69.

Take this further in the full workbook
Example: $281.54. Price plans by visit and equipment.
Excel workbook (.xlsx)
Need more of the workflow?
MEP + home service bundle — $49Flat-rate price book, service agreement calculator and job-cost workbook.Details
How it works
- Hours = (tech + drive hours) × visits
- Direct cost = hours × burdened rate + materials × visits
- Annual price = direct cost ÷ (1 − overhead % − profit %)
- Monthly = annual ÷ 12
Example
With visits per year 2, tech hours per visit 1.25, drive hours per visit 0.5, burdened tech cost per hour $42, filters & materials per visit $18, overhead 20%, profit 15%: annual plan price $281.54; monthly price $23.46; price per visit $140.77.
Questions
Does the monthly result create a subscription?
No. It divides the annual modeled price by twelve. It does not create a billing agreement, charge a card, schedule visits, or establish renewal terms. Those are separate commercial and operational steps.
Are repairs included in this price?
Only scheduled labor and materials represented by your inputs are modeled. There is no repair-risk or emergency-call calculation. Define the actual offer and price additional obligations separately rather than assuming they are covered.
Should I enter the technician’s wage or a selling rate?
Enter the labor cost appropriate to the estimate, including the burden you intend to recover. It is not a customer selling-rate field. The overhead and profit percentages are applied after the direct costs are calculated.
Can I price multiple units with this calculator?
There is no equipment-count field. Your visit time and materials must represent the complete equipment scope. If units have different requirements, build a detailed task estimate first and reconcile it with the calculator inputs.
Does the estimate guarantee savings for the customer?
No. It prices the assumptions entered and does not evaluate energy use or future failures. Use truthful service descriptions supported by the actual maintenance offering, not a promised financial result inferred from this calculation.
Understand the calculation
Begin with the maintenance promise
A maintenance agreement needs a defined service scope before it needs a price. This calculator combines planned visits, labor time per visit, travel time, burdened labor cost, and materials, then adds overhead and profit allowances as percentages of price. It does not inspect equipment or determine the work required. It also does not decide whether an agreement includes repairs, emergency calls, priority scheduling, discounts, or replacement parts.
ENERGY STAR’s maintenance checklist describes professional pre-season checkups and examples of maintenance activities. That reference is useful background, not a scope automatically included in this calculator. Use the equipment requirements, the actual site, and your qualified service process to define the offer. Do not promise a specific energy saving, equipment lifespan, or failure prevention result merely because an annual maintenance price has been calculated.
Keep the labor units consistent
The engine adds hours per visit and drive hours per visit, then multiplies by the number of visits. Those total hours are multiplied by the labor cost per hour. There is no crew-size field. The time and rate must therefore describe the same labor unit. If a visit needs multiple workers, account for their labor consistently instead of combining one worker’s hourly cost with an entire crew’s elapsed time.
The labor cost input is a cost, not a customer selling rate. Use the burdened labor amount that belongs in this estimate. If it already contains a particular overhead allowance, adding the same cost again through the overhead percentage can double count it. Conversely, a bare wage may omit employer costs you intend to recover. Document the input’s basis so another reviewer can understand what the model includes.
Check an annual agreement example
Consider a hypothetical agreement with two visits per year, 1.5 labor-hours per visit, 0.5 drive hours per visit, a $45 labor cost per hour, and $20 of materials per visit. The engine calculates four annual labor-hours, $180 in labor cost, and $40 in materials. Included direct cost is therefore $220 per year. These values are illustrative, not standard service times or recommended prices.
With a 20% overhead allowance and a 15% profit allowance, both measured as percentages of price, the annual price is $220 divided by 0.65, or approximately $338.46. The monthly equivalent is about $28.21 and the per-visit equivalent is about $169.23. The calculator does not turn those equivalents into a payment plan or determine when money is earned or collected.
Understand the percentage denominator
Because overhead and profit are entered as shares of the final price, the engine divides direct cost by one minus their combined percentage. Adding those percentages to direct cost would produce a different amount. For the worked example, adding 35% to $220 would give $297, which does not preserve a combined 35% share of that selling price.
Keep the combined percentages below 100% and review any unusually large result. A small denominator creates a large selling price mathematically, but does not establish market acceptance. The tool does not compare competitors or predict renewal rates. Use your own cost records and actual customer response when evaluating the offer, and keep the arithmetic separate from the commercial decision.
Test travel, frequency, and scope changes
The reference table varies only visit count from the two-visit example. It assumes the same work, travel, and materials on every visit. That assumption may not fit an agreement with different seasonal tasks. Where visits differ materially, estimate each visit’s scope separately and reconcile the total instead of treating the average as a precise description of every appointment.
Travel can be a meaningful cost even when the maintenance work itself is short. Enter the travel share attributable to the visit, and revisit it when the service area or route changes. The calculator does not optimize appointments or allocate shared travel. It also has no separate fields for administration, equipment, permits, or special access. Account for relevant expenses in your cost plan and explain exclusions rather than assuming an attractive margin covers everything.
Separate maintenance pricing from service obligations
An agreement that includes unlimited repairs or emergency response creates obligations beyond this simple scheduled-visit model. This calculator does not estimate failure frequency, claim severity, on-call capacity, or replacement costs. Do not use a scheduled-maintenance price as evidence that broader coverage is financially supportable. Price and review those commitments separately before including them in an offer.
Once the agreement is operating, compare actual visits, labor, materials, and travel with the original assumptions. Track whether promised work was completed and whether the customer received the stated service. Keep pricing versions so that renewals can be based on observed cost changes rather than guesswork. An annualized price is not recurring revenue until an actual commercial relationship and payments support that claim.
Reference examples
| Annual visits | Annual direct cost | Annual modeled price | Monthly equivalent |
|---|---|---|---|
| 1 | $110.00 | $169.23 | $14.10 |
| 2 | $220.00 | $338.46 | $28.21 |
| 3 | $330.00 | $507.69 | $42.31 |
| 4 | $440.00 | $676.92 | $56.41 |
Sources and method notes
Reviewed 2026-11-16. Worked examples are hypothetical and calculated from the formulas shown, not market benchmarks.
- ENERGY STAR: Maintenance Checklist
Background on professional maintenance scope. No service times, prices, or performance guarantees are taken from this reference.
Related calculators
Estimates only. Check them before you bid. Nothing you type is saved. Method & disclosures