Break-even hourly rate calculator
The rate that covers cost over hours you can bill.
Example
Biggest lever: Billable share of paid hours. +10% lowers the result to $96.30/hr.

Take this further in the full workbook
Example: $105.93/hr. Keep the rate calculator in a spreadsheet.
Excel workbook (.xlsx)
Details
How it works
- Billable hours = techs × paid hours × billable %
- Field labor = techs × paid hours × wage × (1 + burden)
- Break-even rate = (overhead + owner pay + field labor) ÷ billable hours
- Target rate = break-even ÷ (1 − profit %)
Example
With annual overhead $180,000, owner pay per year $90,000, field techs 4, average tech wage 28 $/hr, labor burden 30%, paid hours per tech per year 2080, billable share of paid hours 65%, target net profit 15%: break-even rate $105.93/hr; rate at target profit $124.62/hr; billable hours per year 5,408.
Questions
Is this the same as a break-even sales-volume calculator?
No. This model divides a chosen annual cost budget by billable hours to estimate a required hourly rate. A conventional break-even volume calculation starts with selling price, variable cost per unit, and fixed costs to estimate how many units must be sold.
Should I enter 2,080 paid hours for every technician?
Only if that matches your annual paid-hours assumption. The number is an example based on 40 hours for 52 weeks, not a guarantee of billable time. Part-time staffing, overtime, start dates, and other arrangements may require a different budget.
How do I choose billable percentage?
Compare hours you can legitimately bill with total paid field hours over a representative period. Keep the definition consistent and account for seasonality. The calculator’s default is illustrative, not an industry standard. Use separate scenarios when your historical records are incomplete.
Does labor burden mean the same rate for every employer?
No. Employer payroll taxes, insurance, benefits, and compensation arrangements vary. This calculator accepts your aggregate burden assumption rather than calculating statutory obligations. Verify the components with payroll records and the applicable authorities; IRS Publication 15 provides federal employer-tax guidance.
Can I use the target rate directly in a fixed-price quote?
Use it as one planning input, not the whole quote. Multiply an appropriate labor-rate assumption by estimated hours and separately address materials, subcontractors, equipment, and scope-specific costs. Then check the complete job economics and contract terms. The calculator does not guarantee demand or profit.
Understand the calculation
Start with capacity, not a competitor’s hourly rate
An hourly rate has to recover costs across the hours your business can actually sell. Paid hours and billable hours are not automatically equal. Training, holidays, internal meetings, travel that is not billed, callbacks, and gaps between jobs can all affect the denominator. Copying another contractor’s advertised rate tells you little about their cost structure or yours.
This calculator combines an annual labor budget with overhead and owner pay, then divides that total by estimated billable hours. It is a planning model for the inputs shown, not a complete financial forecast. It does not predict demand, ensure that customers will accept the rate, or determine whether every hour in your schedule can be invoiced. Use measured records where possible and label estimates where records are incomplete.
Gather consistent annual inputs
Choose one planning period and keep the inputs consistent with it. Enter annual overhead and annual owner pay, the number of field technicians, the average hourly wage, paid hours per technician, and an assumed burden percentage. The labor calculation applies the wage and burden assumption to every paid hour. The billable-share input then determines how many of those hours are available to recover the full cost budget.
Check whether owner pay is already included elsewhere. An owner who also works as one of the technicians can be counted twice if their full compensation appears in both the technician wage budget and the separate owner-pay input. Likewise, avoid including field wages in overhead when they are already calculated by the labor fields. The calculator cannot detect those classification mistakes; reconcile the categories with your own budget before relying on the result.
An illustrative annual calculation
Consider four technicians, each paid for 2,080 hours at an average wage of $28 per hour, with a 30% burden assumption. Annual field labor is 4 × 2,080 × $28 × 1.30, or $302,848. Add $180,000 of overhead and $90,000 of separately budgeted owner pay, and the modeled annual cost becomes $572,848. At a 65% billable share, the team has 5,408 billable hours. Dividing cost by those hours gives a break-even rate of approximately $105.93 per hour.
A 15% target profit share in this model requires dividing that break-even rate by 0.85, producing approximately $124.62 per hour. Adding 15% to the break-even rate would use a markup instead and would not produce the same margin on revenue. These assumptions are hypothetical examples, not recommended wages, burden rates, utilization targets, or market prices.
Stress-test the hours you expect to sell
Holding the same $572,848 cost budget constant, a lower billable share raises the recovery rate. At 50% billable capacity, the modeled 4,160 hours require approximately $137.70 per hour just to break even. At 75%, the modeled 6,240 hours require approximately $91.80. The reference table shows this sensitivity without claiming that either utilization level is achievable for your operation.
Separate improvements you control from assumptions you merely hope will happen. Better routing might reduce unbilled travel; reliable scheduling might reduce gaps; fewer callbacks might preserve productive time. None of those changes should be entered as achieved capacity before you have evidence. Maintain a conservative base case and a separate improvement case, then compare both with actual time records during the planning period.
Understand what the target rate does not cover
The model has no material-sales, subcontractor, equipment-rental, or transaction-fee input. Do not assume that a labor-rate result automatically prices those items or recovers all costs of a mixed-scope contract. If separate material or service revenue contributes to overhead, avoid charging the same overhead recovery twice across your pricing model. Conversely, do not count on a contribution that your actual sales mix does not produce.
The displayed target-profit rate is a scenario based on the costs you entered. It is not a complete accounting measure of after-tax net income. Financing, working-capital needs, taxes, capital purchases, and contract-specific risks may require additional analysis. Review the result with your own financial records and professional advisers where appropriate rather than using the calculator as a payroll, tax, or accounting compliance tool.
Turn the calculation into a pricing decision
Compare the rate with actual jobs instead of treating it as a mandatory customer-facing hourly charge. A fixed-price project may recover the modeled hourly economics through its total contract price. A service call may combine labor, parts, and a trip charge. In either case, estimate the work consistently and check whether the total contribution is adequate for your cost and capacity assumptions.
A rate above what customers currently accept does not prove that reducing the rate is safe. It points to a decision about cost, scope, capacity, customer segment, or the value of the service offered. Record the assumptions behind a proposed change and use completed-job evidence to evaluate it. Do not describe planned utilization gains or future sales as existing profit.
Review the budget as the business changes
Revisit the calculation when staffing, wages, insurance, vehicles, office costs, or billable capacity materially change. Preserve the previous version so you can explain why a new rate differs. Comparing a monthly actual figure with a full-year assumption without adjusting the time basis can create a misleading result, particularly for seasonal businesses.
Keep an independent record of the inputs and outputs you decide to use; this calculator does not save your entries. A zero technician count or zero billable hours cannot support a finite hourly recovery rate. Implausible percentages can also make a neat-looking number meaningless. Resolve those input problems before preparing a quote, and use a separate cash-flow plan for when bills and customer receipts actually occur.
Reference examples
| Scenario | Calculation | Result |
|---|---|---|
| 50% billable; annual cost $572,848 | $572,848 ÷ 4,160 hours | $137.70 break-even/hour |
| 65% billable; same cost | $572,848 ÷ 5,408 hours | $105.93 break-even/hour |
| 75% billable; same cost | $572,848 ÷ 6,240 hours | $91.80 break-even/hour |
| 65% billable; 15% target profit | ($572,848 ÷ 5,408) ÷ 0.85 | $124.62 target/hour |
Sources and method notes
Reviewed 2026-11-16. Worked examples are hypothetical and calculated from the formulas shown, not market benchmarks.
- SBA: break-even calculator
Explains the distinct fixed-cost and contribution-margin approach to break-even sales volume; this page models hourly cost recovery.
- IRS: Publication 15, employer tax guidance
Use current federal employer-tax guidance when preparing your own burden assumption; this calculator does not calculate those taxes.
Related calculators
Estimates only. Check them before you bid. Nothing you type is saved. Method & disclosures