Janitorial bid calculator
Monthly price from square feet and your production rate.
Example
Biggest lever: Visits per week. +10% raises the result to $2,982.57.

Take this further in the full workbook
Example: $2,711.43. Room rates and monthly contract price.
Excel workbook (.xlsx)
Details
How it works
- Hours per visit = square feet ÷ production rate
- Visits per month = visits per week × 52 ÷ 12
- Direct cost = hours × wage × (1 + burden) + supplies
- Price = direct cost ÷ (1 − overhead % − profit %)
Example
With cleanable square feet 12000, production rate 3000 sq ft/hr, visits per week 5, cleaner wage 17 $/hr, labor burden 20%, supplies & consumables per visit $6, overhead 15%, profit 15%: monthly contract price $2,711.43; price per visit $125.14; price per sq ft per month $0.226.
Questions
Does the default production rate come from ISSA?
No. The default is a calculator example, not a quoted ISSA benchmark or a rate validated for your facility. The linked ISSA reference explains workloading methods. Use a rate supported by your own scope and relevant observations.
Why does five visits a week become 21.667 visits a month?
The engine uses five times 52 divided by 12 to create an average month. Actual calendar months have different service-date counts. Reconcile the average with the contract schedule and any closures or holidays before issuing a quote.
Is the price per square foot a market comparison?
No. It divides this modeled monthly price by the cleanable area you entered. It is an output of your assumptions, not a survey of competitors or a recommended national rate. Compare like scopes before drawing conclusions from that number.
Does this include floor restoration or specialist cleaning?
Only if your inputs and defined scope appropriately represent that work. There are no separate periodic-task or specialist-service fields. Build a detailed estimate for those items rather than assuming that a general square-foot rate covers them.
Can this calculator set a safe staffing level?
No. It estimates hours from the rate you supply and does not evaluate workload safety, required methods, employee needs, or site conditions. Use it as one planning input, not as an instruction to achieve an unsupported production target.
Understand the calculation
Price a defined cleaning scope, not just a building size
This janitorial bid calculator converts cleanable square feet, a production-rate assumption, visit frequency, labor cost, supplies, overhead, and profit into a modeled monthly contract price. It is designed to make the cost logic visible. It does not inspect the facility, select cleaning methods, or discover the tasks required by a customer’s specification. A building’s total area alone is not a complete scope of work.
Before calculating, document the spaces to be serviced, the tasks included, their frequency, and any exclusions. Identify work that happens on every visit separately from periodic work. A single blended production rate is a simplification; it should represent the actual bundle of work being priced rather than one fast task applied indiscriminately to an entire facility.
Understand production rate and labor-hours
The engine divides cleanable square feet by square feet per hour to estimate labor-hours per visit. ISSA’s cleaning-time guidance explains this area-based relationship and also describes other task units, such as fixtures. That distinction is useful: a restroom task measured per fixture is not automatically represented accurately by a building-wide square-foot rate. This calculator offers one area and one production-rate field, so more detailed workloading must be reconciled outside it.
Use records from comparable work or a carefully reviewed task plan to establish the input. Do not mistake the default number for an endorsed industry benchmark. If two people work for two hours each, that is four labor-hours even though only two clock hours elapsed. The wage input is per labor-hour; make sure the production rate uses the same labor basis rather than a crew-level rate that understates paid time.
Work through a transparent monthly example
Consider a hypothetical 12,000-square-foot scope, a 3,000-square-foot-per-labor-hour rate, and five visits per week. Each visit requires four modeled labor-hours. The engine converts weekly visits to an average month using 52 weeks divided by 12 months, producing approximately 21.667 visits and 86.667 labor-hours per month. It is an annualized average, not the exact number of service dates in a particular calendar month.
At a $17 wage and a 20% labor burden input, the modeled labor cost is $20.40 per hour, or $1,768 per average month. Supplies at $6 per visit add $130, bringing direct cost to $1,898. With overhead and profit each set to 15% of price, divide direct cost by 0.70 to obtain approximately $2,711.43 per month. These are illustrative assumptions, not local cleaning prices or a recommended staffing target.
Distinguish an allowance from a markup
The overhead and profit fields in this calculator are percentages of the final price. The engine therefore divides direct cost by one minus both percentages. Simply adding 15% overhead and 15% profit to cost would use a different denominator and produce a different result. If the combined percentages approach 100%, the result becomes extremely large; at 100% the formula cannot recover positive direct costs.
The labor burden input increases the entered wage before labor cost is calculated. It is a planning allowance, not a payroll tax calculation. Check whether the underlying rate appropriately accounts for the labor expenses included in your bid and avoid adding the same expense again through overhead. Likewise, supplies per visit must cover only the consumables included in this agreement. Separate customer-provided supplies from supplies your business must purchase.
Use sensitivity checks before finalizing the bid
The reference table keeps the example’s square footage, wage, burden, supplies, and percentages unchanged while varying visits per week. This makes frequency’s effect visible, but it assumes each visit has the same scope and production rate. In practice, changing frequency may change the work required on each visit. Revisit the assumptions instead of reducing a five-visit bid proportionally when the task list is not truly proportional.
Also compare a slower production-rate scenario with the base estimate. A crowded layout, additional task requirements, or an incomplete scope can change the hours materially. The calculator cannot determine those conditions. Review supervision, travel, setup, equipment, access arrangements, and periodic tasks through your own cost plan. If they are not represented in the inputs or an appropriate overhead allowance, the displayed profit has not paid for them.
Make the quote and the operating plan agree
A useful bid should connect the price to an understandable service description. Record what will be done, where, how often, and how scope changes will be reviewed. Decide how holidays, closures, extra visits, and special requests are handled through your normal agreement process. This calculator does not create those terms or determine legal, employment, safety, or specialist cleaning requirements.
After service starts, compare actual labor-hours and supplies with the estimate while also checking whether the promised work is being completed. A low recorded time is not a success if tasks are being omitted. Keep the baseline and the reason for each change so that later bids benefit from real observations. An accepted proposal, an invoice, and a collected payment remain different events; the monthly price output is none of those events by itself.
Reference examples
| Visits per week | Average monthly labor-hours | Monthly direct cost | Modeled monthly price |
|---|---|---|---|
| 1 | 17.333 | $379.60 | $542.29 |
| 2 | 34.667 | $759.20 | $1,084.57 |
| 3 | 52.000 | $1,138.80 | $1,626.86 |
| 5 | 86.667 | $1,898.00 | $2,711.43 |
Sources and method notes
Reviewed 2026-11-16. Worked examples are hypothetical and calculated from the formulas shown, not market benchmarks.
- ISSA: How to Calculate Cleaning Times
Primary industry reference for area-based and task-based workloading methods. No published production rates are reproduced as calculator recommendations.
Related calculators
Estimates only. Check them before you bid. Nothing you type is saved. Method & disclosures